http://www.organonarchitecture.co.nz/CLIENTS/Bishop-Blackmore/ConsentDocs/Ecoply%20Bracing%20-%20EPG%20Specification%20(Apr-09).pdf WebBaseline 1. BL1. Biosafety Level 1. Note: We have 1 other definition for BL1 in our Acronym Attic. new search. suggest new definition.
Hold-down fixings BRANZ Build
WebUse panel hold downs at each end of the bracing element. The GIB HandiBrac® is recommended. See details in GIB EzyBrace ® Systems or GIB Site Guide. Pairs of hand driven 100 x 3.75mm nails at 600mm centres; or Three power driven 90 x 3.15mm nails at 600mm centres. Concrete floor Use panel hold downs at each end of the bracing element. Webbracing element. Hold downs required Vertical ˜xing Hold downs required Bracing element Single 41mm x 6g GIB® Grabber® Ceramic Coated High Thread Screws at centres that comply with chosen ˜xing option. Single 41mm x 6g GIB® Grabber® Ceramic Coated High Thread Screws at 150mm centres to perimeter of bracing element. 50mm 50mm 50mm … t1 vama
Ecoply® Barrier » Plywood NZ - CHH Ply
http://www.organonarchitecture.co.nz/CLIENTS/Bishop-Blackmore/ConsentDocs/Ecoply%20Bracing%20-%20EPG%20Specification%20(Apr-09).pdf WebUse panel hold downs at each end of the bracing element. The GIB® HandiBrac is recommended. See details in GIB EzyBrace ® Systems or GIB Site Guide. Pairs of hand driven 100 x 3.75mm nails at 600mm centres; or Three power driven 90 x 3.15mm nails at 600mm centres. Concrete floor Use panel hold downs at each end of the bracing element. bravotv credits